Three Re 4/4 with each 4700 kW are necessary to pull this heavy steel train at 80 kph / 50 mph over the Gotthard ramp. |
Date:
12/11/2014 |
Location:
Lavorgo, CH  |
Views:
241 |
Collection Of:

Peider SwissTrip |
Locomotives: |
Author: Peider SwissTrip
|
 |
Picture Categories: |
This picture is part of album: Gotthard Swiss alp transit line, last months without new basic tunnel |